MDF/IDF Facility Standards at

Applied Materials Warehouses,

Office space

WAREHOUSE - OVERVIEW

This document defines infrastructure requirements for MDF and IDF setups in Warehouse environments, customized for small, medium and large warehouses.

WAREHOUSE SIZE CLASSIFICATION

Warehouse SizeApproximate Area
Small<25,000 sq ft
Medium25,000-100,000 sq ft
Large>100,000 sq ft

[Seite 2]

MDF REQUIREMENTS

RequirementSmall WHMedium WHLarge WH
Room size(minimum)12 ft X 12 ft12 ft X 12 ft(12 ft X 12 ft ) X 2 rooms
PowerHouse power+ Backup powerHouse power+ Backup powerHouse power+ Backup power
Temperature20-26(cid:2952)C20-26(cid:2952)C20-26(cid:2952)C
Humidity30-60% RH30-60% RH30-60% RH
ISPDual Redundant ISP’sDual Redundant ISP’sDual Redundant ISP’s

** The number of MDF rooms will depend on the number of floors

IDF REQUIREMENTS

RequirementSmall WHMedium WHLarge WH
Quantity required12-3 per 80m radius3-6+ per layout/floor
Uplink to MDFOM3 fiber (2-6 strands)OM3 fiber (2-6 strands)Redundant OM4/OS2 fiber uplinks
PowerStandard outlet + Backup powerStandard outlet + Backup powerStandard outlet + Backup power
CoolingDedicated cooling preferredDedicated cooling preferredDedicated cooling preferred
MountingWall mounted cabinetsWall mounted cabinetsWall mounted cabinets

** The number of IDF rooms will depend on the number of size/floors

[Seite 3]

CABLING INFRASTRUCTURE

(cid:120) Horizontal cabling

  1. Category: CAT6A

  2. Maximum length: 80 meters (plus patch cords)

  3. Terminated to patch panels in racks

  4. 2 cables per WIFI Access Point

(cid:120) Backbone cabling

  1. Fiber between MDF and IDFs

  2. Type: OM3/OM4(multimode) or OS2(single mode for >300m)

ENVIRONMENTAL REQUIREMENTS

Temperature: 20-26(cid:2952)C in both the MDF and IDF’s. If there is no air conditioning present in the warehouse there must be dedicated air conditioning for the MDF and IDF racks in the Warehouse.

Humidity: 30-60% RH

Fire Suppression: Required for MDF and IDF’s

**Fire suppression depends on the requirements (on-prem servers) in the warehouse

POWER AND BACKUP

House power: Required for all active equipment (Standard 220V/240V outlets)

Back up power: Required for the network equipment in the MDF/IDF. If there is no generator available in the building, a dedicated UPS is required at the MDF and the IDF cabinets. The specification of the UPS will be decided based on the number of equipment in the rack. The run time of the UPS should be at least 25-30 minutes (enough to maintain stability during a power outage).

[Seite 4]

Power Distribution Units (PDUs): Use rack mounted PDU’s for MDF/IDF with surge protection

LAN AND WIRELESS AP CABLING AND

MOUNTING

  1. Use CAT6A for all endpoints

  2. 2 cables per WIFI Access Point

  3. Maximum copper run: 80 meters

  4. Fiber recommended for runs between MDF/IDFs

  5. AP mount height: 10-20 ft (Depending on the ceiling and model)

  6. Cabling path: Use cable trays or conduit depending on the ceiling

  7. Labelling: Label switch ports, AP’s and path panels clearly according to the AP position

  8. LAN drops for:

(cid:120) Office workstations

(cid:120) Security cameras

(cid:120) Label printers

(cid:120) Shipping stations

(cid:120) IOT sensors

(cid:120) Wireless Access points

(cid:120) Badge readers

  1. Mounting:

(cid:120) Avoid mounting APs near HVAC ducts, high EMI sources (welders, motors)

(cid:120) In racked zones mount APs in the aisles, not on top of racks

[Seite 5]

BASIC HARDWARE

  1. Redundant SDWAN edges (2) At leasttwo switches for each rack(Quantity depends on the wh size and requirements) (3) One AP for 1000 sq. feet. (4) Two completely redundant Internet circuits (5) Local wireless controllers are required for large warehouse.

[Seite 6]

OFFICE SPACE - OVERVIEW

This document defines infrastructure requirements for MDF and IDF setups in Office environments, customized for small, medium and large offices.

OFFICE SIZE CLASSIFICATION

Office SizeApproximate Area
Small<50,000 sq ft
Medium50,000-100,000 sq ft
Large>100,000 sq ft

MDF REQUIREMENTS

RequirementSmall OfficeMedium OfficeLarge Office
Room size(minimum)12 ft X 12 ft12 ft X 12 ft(12 ft X 12 ft ) X 2 rooms
PowerHouse power+ Backup powerHouse power+ Backup powerHouse power+ Backup power
Temperature20-26(cid:2952)C20-26(cid:2952)C20-26(cid:2952)C
Humidity30-60% RH30-60% RH30-60% RH
ISPDual Redundant ISP’sDual Redundant ISP’sDual Redundant ISP’s

** The number of MDF rooms will depend on the number of floors

[Seite 7]

IDF REQUIREMENTS

RequirementSmall OfficeMedium OfficeLarge Office
Quantity requiredDepends on the office size/no. of floorsDepends on the office size/no. of floorsDepends on the office size/no. of floors
Uplink to MDFOM3 fiber (2-6 strands)OM3 fiber (2-6 strands)Redundant OM4/OS2 fiber uplinks
PowerStandard outlet + Backup powerStandard outlet + Backup powerStandard outlet + Backup power
CoolingDedicated cooling preferredDedicated cooling preferredDedicated cooling preferred

** The number of IDF rooms will depend on the number of floors

CABLING INFRASTRUCTURE

(cid:120) Horizontal cabling

  1. Category: CAT6A

  2. Maximum length: 80 meters (plus patch cords)

  3. Terminated to patch panels in racks

  4. 2 cables per WIFI Access Point

(cid:120) Backbone cabling

  1. Fiber between MDF and IDFs

  2. Type: OM3/OM4(multimode) or OS2(single mode for >300m)

[Seite 8]

ENVIRONMENTAL REQUIREMENTS

Temperature: 20-26(cid:2952)C in both the MDF and IDF’s.

Humidity: 30-60% RH

Fire Suppression: Required for MDF and IDF’s

**Fire suppression depends on the requirements (on-prem servers) in the office

POWER AND BACKUP

House power: Required for all active equipment (Standard 220V/240V outlets)

Back up power: Required for the network equipment in the MDF/IDF. If there is no generator available in the building, a dedicated UPS is required at the MDF and the IDF cabinets. The specification of the UPS will be decided based on the number of equipment in the rack. The run time of the UPS should be at least 25-30 minutes (enough to maintain stability during a power outage).

LAN AND WIRELESS AP CABLING AND

MOUNTING

  1. Use CAT6A for all endpoints

  2. 2 cables per WIFI Access Point

  3. Maximum copper run: 80 meters

  4. Fiber recommended for runs between MDF/IDFs

  5. AP mount height: 10-20 ft (Depending on the ceiling and model)

  6. Cabling path: Use cable trays or conduit depending on the ceiling

  7. Labelling: Label switch ports, AP’s and path panels clearly according to the AP position

  8. LAN drops for:

(cid:120) Office workstations

[Seite 9]

(cid:120) Security cameras

(cid:120) Printers

(cid:120) Wireless Access points

(cid:120) Badge readers

  1. Mounting:

(cid:120) Avoid mounting the AP’s above cubicle seats

BASIC HARDWARE

  1. Redundant SDWAN edges (2) At leasttwo switches for each rack(Quantity depends on the officesize and requirements) (3) One AP for 1000 sq. feet. (4) Two completely redundant Internet circuits (5) Local wireless controllers are required for large offices.

[Seite 10]

Responsibility Matrix

Requirementspecifyprocureinstallfund
Network HardwareGISGISLow-voltage contractor(BU)BU
Wireless Access pointsGISGISLow-voltage contractor(BU)BU
CablingGIS/BULow-voltage contractor(BU)Low-voltage contractor(BU)BU
Cable tray/conduit installation(if required)GIS ( IT requirement)General Contractor (BU)General Contractor (BU)BU
MDF/IDF/MPOE roomsGIS ( IT equipment requirement)General Contractor (BU)General Contractor (BU)BU
Racks/cabinets/cable managementGISGeneral Contractor (BU)General Contractor (BU)BU
IT equipment Power/Cooling requirementsGISGeneral Contractor (BU)General Contractor (BU)BU
Backup Power/Cooling for IT roomsGIS ( IT equipment requirement)General Contractor (BU)General Contractor (BU)BU
Internet linksGISGISGIS coordinates with BU Local ContactsBU
Fire Supression for MDF/IDFEHSGeneral Contractor (BU)General Contractor (BU)BU