Sanierung der Stützen im unterirdischen Parkhaus Klostergarasjen

Status
Offen
Angebotsfrist
09.11.2026, 12:00 (Europe/Berlin)
Geschätzter Wert
90.000.000 NOK
Lose
1
Erfüllungsregion
NO0A2, Norway
Verfahren
Offenes Verfahren
Auftragsart
Bauleistung
Veröffentlicht
29.10.2026
CPV-Codes
Anzeigen
  • Beton (44114000)
  • Bauarbeiten (45000000)
  • Baureifmachung (45100000)
  • Komplett- oder Teilbauleistungen im Hochbau sowie Tiefbauarbeiten (45200000)
  • Bau von Parkhäusern (45213312)
  • Bau von Parkplätzen (45223300)
  • Bau von Tiefgaragen (45223310)
  • Betonarbeiten (45262300)
  • Bauinstallationsarbeiten (45300000)
  • Rehabilitationsmaßnahmen im Krankenhaus (85111400)
  • Rehabilitation (85312500)
Bekanntmachung
permalink.mercell.com
Bekanntmachungsnummer
751702-2026
Verfahrensnummer
da6e41a7-96c1-4de5-8bd4-c5f0d1d64f4e

Fragenkatalog

Deine Fragen an die Ausschreibung, beantwortet aus Bekanntmachung und Unterlagen.

Kurzbeschreibung

Bergen kommune – Etat for bygg og eiendom schreibt die Sanierung der Stützen im unterirdischen Parkhaus Klostergarasjen im Zentrum von Bergen, Norwegen, aus. Das 2005 eröffnete Parkhaus umfasst sechs Ebenen mit rund 940 Stellplätzen; der geschätzte Auftragswert beträgt 90 Millionen NOK.

KI-Zusammenfassung · Maßgeblich ist die Originalbekanntmachung.

Auf einen Blick

KI-Auswertung der Bekanntmachung

So schnell verstehst du mit VergabeHero jede Ausschreibung.

Termin buchen

Leistungsbeschreibung

The klostergarasjen is an underground car park, located in the centre of Bergen, driving in from Jonsvollsgaten and access from Veiten/Markeveien, from Klosteret and from Valkendorfsgaten/Vågen. The garage was opened in 2005 and has a total of 13,960 m2 gross. The facility is established as a rock facility with the accompanying concrete structures and it covers the construction in several levels. The parking facility consists of six parking levels called plan A-F and has a total capacity of approx. 940 parking places.

Leistungen nach Losen (1)

  • LOT-0000 · E0015EBE - Klostergarasjen - renovation columns90.000.000 NOK

    The klostergarasjen is an underground car park, located in the centre of Bergen, driving in from Jonsvollsgaten and access from Veiten/Markeveien, from Klosteret and from Valkendorfsgaten/Vågen. The garage was opened in 2005 and has a total of 13,960 m2 gross. The facility is established as a rock facility with the accompanying concrete structures and it covers the construction in several levels. The parking facility consists of six parking levels called plan A-F and has a total capacity of approx. 940 parking places.

    Frist: 09.11.2026, 01:00 (Europe/Berlin)

Anforderungen an deinen Betrieb

Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier. Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48). Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15). Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42) Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision. Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1). Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition? Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents. Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award? Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents? Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition? Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions? The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply? Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in? Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions. Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions. Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions. Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.

Wie wird das Angebot bewertet?

LOT-0000 · E0015EBE - Klostergarasjen - renovation columns

The price consists of the following price elements, which will be added together to a total evaluation sum in NOK excluding VAT: SUM - Average Contract Sum (average sum of the given contract sums with different alternatives). SUM - Calculation work multiplied by estimated amount SUM - Mark-up prostent with an estimated sum for the purchase of material/procurement/other costs multiplied by the offered mark-up percentage (1+ the offered mark-up percentage). SUM - Follow-up in the guarantee period. See Annex 4A - Price Form for further information. Documentation requirement: Completed Annex 4A - Price Form can be uploaded together with the tender.
50 %
Under this award criteria, the contracting authority will evaluate the contractor's understanding of the project ́s challenges and the offered system for planning and carrying out the work. The three assignments below shall be answered. Each assignment is to be weighted equally under this award criteria. Assignment 1 - HSE and risk management Describe the most important HSE risks involved in implementing the project at Klostergarasjen and how these risks will be dealt with through planning, execution and control. Identify and prioritise the risks that, according to the contractor ́s assessment, are particularly critical for this project and describe concrete measures to reduce the likelihood and/or consequences of the identified risks. The description ought to include: project specific HSE risks and prioritising them. concrete measures to deal with identified risks work on and in existing supporting constructions. planning and follow-up of temporary support and stamping work control routines, responsibilities and documentation. safety for road users, the public and employees. Maximum 1,000 words for this assignment. Words over 1000 will not be evaluated. Assignment 2 - Planning and execution with full operation Describe how the work will be planned and carried out so that the parking facility can maintain full operation throughout the construction period, including how the practical execution of the works will be organised, and how the challenges will be dealt with as a result of construction work and operation of the parking facility going on simultaneously. The description ought to include: staged execution and order of work planning and managing progress traffic management and maintaining the necessary access and driving patterns. rigging, logistics, goods deliveries and internal transport. coordination between activities and work operations measures to limit noise, dust and other disadvantages for users and environments. handling conditions that can affect the planned execution or operation of the parking facility. Maximum 1,000 words for this assignment. Words over 1000 will not be evaluated. Task 3 - Interaction Describe how the contractor will contribute in the interaction phase and during the execution of the project. Describe how the contractor will contribute to developing and optimising systems, ensuring practical implementation strategies, as well as ensuring good information flow and efficient clarifications, without this being at the cost of quality, safety or lifetime. The description ought to include: organisation of the interaction and responsibility and communication lines. methods and routines for meetings, clarifications and decisions. information flow and documentation cooperation with the builder, engineering designer and other relevant actors. how the contractor ́s execution competence and experience will be used in the interaction phase. identifying and assessing possibilities for alternative or optimised systems. measures to reduce costs and/or implementation risk without reducing quality, safety or lifetime. how clarifications and optimisations are followed-up and incorporated in the further implementation. Maximum 1,000 words for this assignment. Words over 1000 will not be evaluated. Documentation requirement for the award criteria "Quality - Assignment comprehension": The tenderer ́s own solution description with a maximum of 3,000 words divided between the three assignments (see the maximum words per task in each task text). A front page is allowed, and neither is included in the evaluation nor a maximum word. Links/hyperlinks and/or enquiries to other annexes in the tenderer ́s tender will not be evaluated or evaluated by the Contracting Authority. The tenderer ́s solution description shall be concrete, as it will be binding for the tenderer during the entire contract period.
50 %

Vergabeunterlagen

Keine abgerufenen Dateien hinterlegt. Ein abgeschlossener Abruf ist nicht dokumentiert.

Zum Ursprungsportal

Anforderungen

Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, by enforceable judgement been convicted of corruption by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Corruption as defined in Article 3 of the Convention on Combating Corruption, involving European Communities or European Union member states (EUT C 195 of 25.6.1997, s. 1), and in Article 2, point 1, in the Council ́s framework decision 2003/568/RIA of 22 July 2003 on combating corruption in the private sector (EUT L 192 of 31.7.2003, p. 54). This rejection reason also includes corruption as defined in national law for the contracting authority or supplier. Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted of fraud has been convicted of fraud by a verdict handed down not more than five years ago, or a rejection period determined directly in the judgement that still applies? Fraud included in Article 1 of the Convention on protection of the Financial Interests of the European Communities (EFT C 316 of 27.11.1995, p. 48). Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of money laundering or financing terrorism by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Money laundering or financing terrorism As defined in Article 1 of the European Parliament and Council Directive 2005/60/EF of 26 October 2005 on preventive measures against the use of the financial system for money laundering and financing terrorism (EUT L 309 of 25.11.2005, p. 15). Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, at the time a legally convicted verdict of participation in a criminal organisation by a verdict handed down no more than five years ago, or a rejection period set out directly in the judgement that still applies? Participation in a criminal organisation as defined in Article 2 of the Council ́s framework decision 2008/841/RIA of 24 October 2008 on control of organised crime (EUT L 300 of 11.11.2008, p. 42) Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body, or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of acts of terrorism or criminal acts connected to terrorist activities by a verdict handed down no more than five years ago, or a rejection period set directly in the judgement that still applies? Acts of terrorism or criminal acts relating to terrorist activity as defined in Article 1 and 3 of the Council ́s framework decision 2002/475/RIA of 13 June 2002 on combating terrorism (EFT L 164, af 22.6.2002, p. 3). This rejection reason also includes incitement to, participation or attempts to commit such actions as included in Article 4 in the mentioned framework decision. Is the tenderer himself or a person, who is a member of the tenderer's administration, management or supervisory body or has the competence to represent or control or make decisions in such bodies, in the event a legal verdict has been convicted of child labour and other forms of human trafficking by a verdict handed down no more than five years ago, or a rejection period determined directly in the judgement that still applies? Child labour and other forms of human trafficking as defined in Article 2 of the European Parliament and council directive 2011/36/EU of 5. 1 April 2011 on the prevention and control of human trafficking and the protection of its victims and for compensation of the Council ́s framework decision 2002/629/RIA (EUT L 101 of 15.4.2011, p. 1). Is the tenderer aware of breaches of environmental provisions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. Is the tenderer aware of breaches of provisions on working conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. Is the tenderer aware of breaches of provisions on social conditions as stated in national law, the relevant notice or procurement documents or Article 18 (2) of Directive 2014/24/EU. Has the tenderer entered into agreement(s) with other tenderers with the intention of turning the competition? Has the tenderer committed serious errors in professional practice? If relevant, see the definitions in national law, the relevant notice or procurement documents. Have the tenderer:a) given grossly incorrect information when notifying the information required to verify that there is no basis for rejection, or of the qualification requirements being met,b) failed to provide such information,c) subject to immediately submitting the supporting documents requested by the Contracting Authority, ord) improperly affecting the Contracting Authority's decision process to acquire confidential information that could give this an unlawful advantage in connection with competition, or negligently has given misleading information that can have a significant influence on decisions on rejection, selection or award? Are tenderers aware of a conflict of interest as stated in national law, the relevant notice or procurement documents? Has the tenderer or an entity associated with the supplier advised the contracting authority or in another way been involved in the planning of the competition? Has the tenderer committed significant breaches of contract in connection with the fulfilment of a previous public contract, a previous contract with a public contracting authority or a previous concession contract, where the breach has led to the cancellation of the contract, compensation or other similar sanctions? The contracting authority shall state that in Norway there are national rejection reasons. These shall be described in the procurement documents. Tenderers must respond to whether they are in one or more of the situations described in the national rejection reasons. Will the purely national rejection reasons, as stated in the relevant notice or in the procurement documents, apply? Have tenderers failed to fulfil all their social security obligations in the country where they are established and in their member state, if this is a different country than what he is established in? Has the tenderer not fulfilled his tax and duty obligations in the country in which he is established, and in the contracting authority's member state, if this is a different country than what he is established in? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions. Is the tenderer in a bankruptcy situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions. Is the supplier in a situation where he has been forced debt arrangement? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions. Is the tenderer in an insolvency situation? Specify why, under the mentioned circumstances, one is able to carry out the contract, considering the current national provisions and measures for continuing the business activities? It is not necessary to provide this information if rejection of tenderers made mandatory in accordance with the current national law without the possibility for exceptions.

Änderungen und Bieterfragen

0 Einträge

Keine Änderungen zur Bekanntmachung bekannt.

Welche ähnlichen Ausschreibungen sind offen?

Alle ähnlichen Ausschreibungen anzeigen

Alle Angaben ohne Gewähr. Ausschreibungen können sich jederzeit ändern – wir übernehmen keine Gewähr für Aktualität, Vollständigkeit oder Richtigkeit der hier dargestellten Daten. Maßgeblich ist stets die Originalbekanntmachung des Auftraggebers.