[Seite 1]
115.00 115.00
114.50 114.50
114.00 114.00
113.50 113.50
113.00 113.00
112.50 112.50
112.00 112.00
111.50 111.50
111.00 111.00
110.50 110.50
110.00 110.00
109.50 109.50
109.00 109.00
108.50 108.50
108.00 108.00
107.50 107.50
107.00 107.00
106.50 106.50
106.00 106.00
105.50 105.50 BEW-10-V BEW-09-V 105.00 BEW-11-V D=113.05 D=113.12 105.00 BEW-12-V D=112.56 S=96.00 S=96.00 BEW-13-V D=112.06 S=96.00 t=17.05 m t=17.12 m 104.50 104.50 D=111.75 S=96.00 t=16.56 m S=96.00 t=16.06 m 104.00 t=15.75 m 104.00
103.50 103.50
103.00 103.00
102.50 102.50
102.00 102.00
101.50 101.50
101.00 101.00
100.50 100.50
100.00 100.00
99.50 99.50
99.00 99.00 Achse: 98.50 98.50 Vertikalfilterbrunnen 98.00 98.00 Höhenplan: 97.50 97.50 Vertikalfilterbrunnen 97.00 97.00 Station: -0+010.193 - 0+178.948 96.50 96.50
96.00 96.00 DHHN 95.00 95.50 95.50
95.00 Schachtbezeichnung
vorh. Geländehöhe [m]
Tiefe [m]
GW-Stand in Ruhe [m]
Station [m] 91,01- 57,111 57.51 00.201
00,0 60,211 60.61 00.201 92,82 65,211 65.61 01.201 33,27 50,311 50.71 32.201 50,331 21,311 21.71 13.201 40,161 59,871 DPH 2-26 BK 2-26
BK 1-26 DPH 1-26
H=104.40 höchster zulässiger GW-Stand bei HQ200
GW in Ruhe (08/2026) GW in Ruhe (14.01.2019)
GW in Ruhe (08/2026)
Legende
Auffüllung Mittelkies Mittelsand A
Steine Feinkies Sand
Grobkies Grobsand
AUFTRAGGEBENDE LAGEREFERENZSYSTEM Leipziger Wasserwerke ETRS89_UTM33N HÖHENSYSTEM KWL GmbH DHHN2016 BEW-13-V BEW-12-V BEW-11-V BEW-10-V BEW-09-V AUFTRAGNEHMERIN BEARBEITET Ingenieurbüro Klemm & Hensen GmbH 27.08.2026 tpf GEZEICHNET Beratende Ingenieure 27.08.2026 afl
PROJEKT PROJEKT-NUMMER Wasserwerk Canitz 04201-0 & 03230-1 LEISTUNGSPHASE Hochwasserschutz HQ200 & Leitungsneuordnung 5
PLAN MAßSTAB Längsschnitt 1:500 PLAN-NUMMER Binnenentwässerung Hangseite mit Vertikalfilterbrunnen B 800 / H 594 3.5